2 St James' Way Newcastle

2 St James' Way Newcastle

Adapt supplied 2,000 m² of panel decking for St James Way, a project with an overall value of £30 million. The decking system offered a lightweight solution for slab construction on a programme with demanding timescales. Customer feedback highlighted the system’s adaptability, with fewer infill areas and fewer props beneath the structure.This helped the site team organise the work around the demands of the concrete frame programme.

Project Overview

The lower level slabs were 1 metre thick and we managed to re use the same kit on the standard slabs above by changing the grid size opening up the span of the props. No need for two different systems here. Also the large cantilever at the slab edges were easily accommodated using our 3.8 metre perimeter beams

  • Duration: 30 Weeks
  • 9 Levels
  • Panel Decking Formwork