Battersea London

The longest building in Europe and the UK's largest mixed use construction project.

Project Overview

This building was to become the longest in Europe and was the UKs largest mixed use construction project. The bespoke solution that only Adapt could offer allowed all panel decking without infills or perimeter tables needed. Achieved by creating triangular panels to allow the snake shape on plan view

  • Duration: 80 weeks
  • Hydraulic Climbing Formwork
  • 2 Cores