Canada Water

Canada Water

Adapt supplied formwork equipment for the Canada Water project, which had an overall value of £100 million. The arrangement combined table trolleys on C hooks with core formwork incorporating stripping corners.The table handling arrangement helped minimise assembly time. The core stripping corners could be released using the crane or levers, allowing the formwork to be struck quickly for the next stage of construction.

Project Overview

This project involved 8 cores and a table decking system. The swivel heads allowed the edge protection to remain in place while tables were moved up to the next level. Main table sizes were 5.9 x 4.9 metres.

  • Duration: 52 Weeks
  • Levels: 12
  • 3000m2 per floor