Mayfair London

Mayfair London

A bespoke finish with optimal results for this high spec project in the heart of London.

Project Overview

With a very bespoke finish requirement and plywood / tie hole pattern we used Enkoform wall shutters along with RKS to achieve the optimal results for this high spec project in the heart of London's busiest area

  • Duration: 60 Weeks
  • Single sided walls 9 metres high
  • Wall Formwork
  • 3 hydraulic climbing cores brough up together